this post was submitted on 11 Nov 2024
842 points (96.7% liked)
memes
10673 readers
2770 users here now
Community rules
1. Be civil
No trolling, bigotry or other insulting / annoying behaviour
2. No politics
This is non-politics community. For political memes please go to [email protected]
3. No recent reposts
Check for reposts when posting a meme, you can only repost after 1 month
4. No bots
No bots without the express approval of the mods or the admins
5. No Spam/Ads
No advertisements or spam. This is an instance rule and the only way to live.
Sister communities
- [email protected] : Star Trek memes, chat and shitposts
- [email protected] : Lemmy Shitposts, anything and everything goes.
- [email protected] : Linux themed memes
- [email protected] : for those who love comic stories.
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
There are benefits of overhead lines. They are cheaper to install, maintain, and repair. Diagnosing problems are much easier as well. They're certainly uglier and easier to damage but you don't have to dig up the road to fix them.
Newer cities shouldn't install overhead lines but to have old cities with overhead lines switch to underground ones is very expensive and takes a lot of time, something smaller cities likely don't have the budget for.
You don't have to dig up the roads to fix buried power lines any more than you have to tear up your walls to replace power lines in your house: you install a conduit (basically a pipe) under the road once and if the cable somehow gets damaged and needs to be replaced you can just run new cable through the existing conduit by simply pushing it in on one end and pulling from the other.
Transformers and other non-cable equipment are typically housed aboveground in little boxes or built in to the house, so they're actually easier to maintain than if they were installed aboveground on a pole since you don't need a cherrypicker to access it.
Obviously in a less wealthy small town with existing overhead infrastructure it doesn't make much sense to move it all underground "just because", but if you're already trenching under the road to install water/sewage/gas mains, it won't cost much extra to throw down an additional one or two smaller conduits for running power cables or telephone/cable/fiber lines.