this post was submitted on 11 Nov 2024
842 points (96.7% liked)
memes
10673 readers
2869 users here now
Community rules
1. Be civil
No trolling, bigotry or other insulting / annoying behaviour
2. No politics
This is non-politics community. For political memes please go to [email protected]
3. No recent reposts
Check for reposts when posting a meme, you can only repost after 1 month
4. No bots
No bots without the express approval of the mods or the admins
5. No Spam/Ads
No advertisements or spam. This is an instance rule and the only way to live.
Sister communities
- [email protected] : Star Trek memes, chat and shitposts
- [email protected] : Lemmy Shitposts, anything and everything goes.
- [email protected] : Linux themed memes
- [email protected] : for those who love comic stories.
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Boring through rock is super slow and expensive, plus now your tunnel needs to be big enough to walk & run machines through, and needs aircon to keep it cool. It is done, but usually only in CBD areas where you need lots of cables and room for future expansion. Google 'cable tunnel' and you'll find lots of examples. Trenching machines go through very expensive consumable digging teeth whereas bucket trucks are just a fancy forklift, burning fuel and needing hydraulic & engine maintenance.
With high voltage cables, the (really thick) insulation gets really expensive, plus you need more conductor (copper/aluminium) because the insulation needs to stay cool. Aerial lines are directly air cooled (better cooling), and can run hotter, because the limit is the metal getting too hot and sagging, not the plastic degrading. Glass insulators are only needed at every tower and can be easily replaced.
Because keeping the conductor small is important, you need to use expensive copper rather than cheap aluminium for cables.
You also need regular joints which are very labour intensive, because they have to be perfect and you can't make a cable the full length because you can't ship a drum that big.
If a cable fails, fixing it is much harder than fixing an aerial issue. There was a cable fault in LA in 1989 that took 8 months of round-the-clock work to fix. When a tower falls over (usually because of slope failure or undermining), temporary structures are usually up in a couple of days.
Digging trenches under roads is much more invasive than pulling cables over roads, and rivers are even worse to deal with. It's very common for underground cables to be converted to overhead when they cross a river before heading back underground.
The Western HVDC Link between Scotland and England was built as an undersea cable because it's so hard to get planning permission and land rights to do major projects in the UK, as High Speed 2 found out.
So what I have seen is these machines that push them through earth. We do get a lot of commercials in the area telling people to call a number before they do any digging on their property. They come out and mark where the cables are. We did end up having a condo thing where power was knocked out because the guy mismarked the area. He actually came back after and tried to put correct markings in. I heard he got fired.
Yeah, directional thrusting is a thing. It was used a lot when contractors were installing NZ's new fibre network about a decade ago. I don't think it's in as widespread usage for power because power cables tend to have much wider bending radii.
This sorta surprises me as I would think the fiberoptic would be worse than copper. I guess the thing ones could roll up pretty good but we had to be much more careful with them than the copper internet at least.
Fibre needs bigger bend radii proportional to the cable size, but they're still rarely over 15mm diameter cables so you can bend them in like 150mm.
Once you start getting to 11kV MV cables, they do like 2m bend radii.