this post was submitted on 09 Aug 2024
306 points (99.4% liked)

Space

8478 readers
5 users here now

Share & discuss informative content on: Astrophysics, Cosmology, Space Exploration, Planetary Science and Astrobiology.


Rules

  1. Be respectful and inclusive.
  2. No harassment, hate speech, or trolling.
  3. Engage in constructive discussions.
  4. Share relevant content.
  5. Follow guidelines and moderators' instructions.
  6. Use appropriate language and tone.
  7. Report violations.
  8. Foster a continuous learning environment.

Picture of the Day

The Busy Center of the Lagoon Nebula


Related Communities

🔭 Science

🚀 Engineering

🌌 Art and Photography


Other Cool Links

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 89 points 1 month ago (20 children)

The report included several recommendations, including levying “financial penalties for Boeing’s noncompliance with quality control standards.” The inspector general said, however, that NASA decided not to introduce any kind of financial discipline.

Goddamnit.

The new report said the SLS Block 1B version is likely to cost $5.7 billion by the time it launches.

The assessment is the latest setback for NASA's return-to-the-moon program, which has been beset by holdups and budget overruns. NASA has spent more than $42 billion over more than a decade on its Space Launch System and Orion spacecraft.

Last year, NASA’s inspector general estimated that each Artemis launch would cost $4.2 billion.

Hot take: The government should not give Boeing any more money with which to do stock buybacks, instead of hiring qualified people, and performing the best QA possible.

load more comments (18 replies)