sunbeam60

joined 10 months ago
[–] [email protected] 4 points 10 months ago (3 children)

I’m not sure the queue for the 319, 320 and 321 can get any longer. Airbus simply can’t ramp production and it’s not like the C919 is ready for prime time (yet).