this post was submitted on 05 Aug 2024
42 points (100.0% liked)

Map Enthusiasts

3355 readers
1 users here now

For the map enthused!

Rules:

founded 1 year ago
MODERATORS
 

1st segment is under construction with completion date of 2027. 2nd segment has been extended to the Western Desert and has begun construction, with no announced end date. Construction of the 3rd segment, which is currently in the planning stage, is reported to begin soon. Further lines are proposed

top 5 comments
sorted by: hot top controversial new old
[–] [email protected] 5 points 1 month ago (1 children)

I plan on visiting someday. This is awesome to hear!

[–] [email protected] 4 points 1 month ago

Ahlan wa Sahlan

I hope one day the rail network in Egypt is connected to Saudi Arabia. There has been talks about a bridge across the Gulf of Aqaba, but maybe that won't be necessary.

[–] [email protected] 1 points 1 month ago (1 children)

Is the reason there's no plans for the lower delta?

[–] [email protected] 3 points 1 month ago

The delta has lots of rail, and since the distances aren't that long and Egypt doesn't really have money to spare I guess using the normal rail there is fine.

[–] [email protected] 1 points 1 month ago

downloads pocket trains